    I wonder if it makes sense to change net control operators to one week only? If we have 43 ARES members and they’re all required to operate as net control once a year to keep up their membership, we’d need 43 weeks to get them all in. Even if we only had 30 members, it’s still not possible with two week assignments.

    Just a thought! – Neil

    #12147

    Yes, we have talked about doing that and will start that at the next sign up. The bigger issue is getting those 43 people to sign up to be Net Control. Pat